The XM8 was designed by FMC as part of the abovementioned Armored Gun System program to replace the M551. Commander: 12.7 mm M2 Browning (210 rounds). The M8 was armed with the XM35 105mm cannon which used a new design to radically reduce recoil and create a simpler, lighter main gun equipped with an auto-loading system which eliminated the fourth crewmember. It kills other kinds of targets. Power is provided by a Detroit Diesel 6V-92TIA diesel developing 580 hp. Its unique features include an autoloader for the main gun, a three-man crew. In 1980 the Army's 9th Infantry Division was selected as the test unit for the new High Technology Light Division (HTLD). The M8 was later type-classified by the US Army in late 1995 and initially slated for production in 1996. The basic hull of the M8 is made of welded aluminum alloy, with a unique modular armoring system that allows the vehicle to be equipped according to requirements. The M8 Thunderbolt Demonstrator M8 Thunderbolt Armored Gun System Background. PAN35039 1:35 Panda M8 Armored Gun System [Model Building KIT] by Panda Model. The Army had planned to procure 26 low-rate initial production vehicles with 1996 funding of $142.8 million. The M8 can be fitted with three levels of protection: In 1980 the Army established a need for a Mobile Protected Gun System (MPGS) to support its light divisions. This gave it a rate of fire of about 12 rounds per minute. BAE System will build an M8 Buford Armored Gun System with new capabilities for its prototype for the Army's Mobile Protected Firepower vehicle. BAE Systemsâ MPF. US forces using enhanced direct-fire weapons such as the Armored Gun System would The M8 was armed with a rifled 105 mm main gun that was loaded automatically. Rheinmetall XM35 tank gun. In the fiscal 1996 budget the Armored Gun System was slated to enter production. Paint and glue is NOT included. The M8 is the result of the Armored Gun System (AGS) concept that originated in the early 1980s to provide light forces with more powerful direct support. M8 Buford Armored Gun System: The M551 Sheridan light tank was an interesting side note in American armor development. In 1989 the Commander, XVIII Airborne Corps, stated the need to replace the M551A1 Sheridan, and he endorsed the 1985 AGS ROC as needing only minor revisions to meet his requirements. The HTLD was designed to fight in the deserts of Southwest Asia. The substitutes did not provide the capabilities envisioned by the original concepts. 1/72 4D 8pcs Assemble Tank 4D Plastic Model Kit The Battle Chariot Series. All versions are air-transportable by C-5 Galaxy and C-17 Globemaster III (five and three respectively). BAE is updating the M8 Buford armored gun system to give it new components and new capabilities. Several attempts over the years to update or replace them proved unsuccessful. In 1980 the Army's 9th Infantry Division was selected as the test unit for the new High Technology Light Division (HTLD). only requires a crew of three through the use of an autoloader. The decision was made by the Army as part of an assessment of the warfighting value of the armored gun system compared with alternatives and how they could do it spending less funds. M8 Buford Armored Gun System: The M551 Sheridan light tank was an interesting side note in American armor development. The gunner's primary sight is a day/night thermal sight and integrated laser range-finder in a stabilized mount. This is a plastic model kit. One design feature that resulted in a 'surprise' outcome was the ammunition compartment feature that failed to contain the reaction of the ammunition when struck by realistic threat weapons. This tank was selected as a winner in the Armored Gun System programme and was redesignated as the M8 in 1996. Several attempts over the years to update or replace them proved unsuccessful. Articles incorporating text from Wikipedia, PostâCold War tanks of the United States, Abandoned military projects of the United States, Trial and research tanks of the United States, United Defense Unveils Thunderbolt 120 mm Demonstrator, https://military.wikia.org/wiki/M8_Armored_Gun_System?oldid=4533928. It's a thin-skinned vehicle with a gun on it. In the 1980s, the United States Army began looking for a replacement for their M551 Sheridan tanks. Level II against armor piercing small arms and small cannon fire. The M-35 cannon is a low-recoil gun that allows the use of previously developed 105mm ammunition. Contains parts to build one model. In other cases, such as the Armored Gun System (AGS), it could not even field prototypes. TakoÄer je bilo planirano da zamijeni HMMMV M966 oklopna vozila koja su bila naoružana sa protivoklopnim raketama BGM-71 TOW. The M8 Armored Gun System was a light tank Developed in the 1900's. The M8 Armoured gun System-page contains all related products, articles, books, walkarounds and plastic scale modeling projects dedicated to this vehicle. The United Defense M8 Armored Gun System was an American light tank that was intended to replace the M551A1 Sheridan in the 82nd Airborne Division, as well as being expected to replace TOW -equipped Humvees in the 2nd Armored Cavalry Regiment (2nd ACR). The revised AGS ROC was approved by the Army in September 1990, followed shortly thereafter by the DAB approval of its acquisition as a non-developmental item. More about the M8 Armoured gun System tank. Image from BAE Systems. Ryan D. McCarthy visit BAE Systems and inspect BAEâs Mobile Protected Firepower (MPF) The vehicle leverages investments the Army made in the M8 Armored Gun System, including its low-profile design, and proven technologies like the M35 105mm cannon, and an auto-loading ammunition system that allows the gun to fire at a ⦠While the XM35 had lower recoil forces, it still fired all of the rounds that were common to the M60 and early M1 Abrams tanks. The Level I (basic) armor package is designed for the rapid deployment role and can be airdropped from a C-130 Hercules and protects the vehicle against small-arms fire and shell splinters. A total of six prototypes were eventually built for the US Army under the designation of the XM8 AGS. Due to several budget cuts and constraints, critical pieces of equipment needed to realize the division concept were never available. $20.49. The Armored Gun System, or AGS for short, was a US Army competition in the 1980s to design a light tank to replace the M551 Sheridan and TOW-equipped HMMWVs. Advanced technologies incorporated into this variant include hybrid electric propulsion, band track, improved ceramic/composite armor, Second Generation FLIR Night Vision technology, digitization, a XM-291 120 mm main gun along with its 120 mm auto loader. Popular . The Armored Gun System is an example of a program in which manpower and personnel integration [MANPRINT] considerations were purposely rejected. The M8 is the result of the AGS concept which originated in the early 1980s as a means of providing light forces with more powerful direct support. The AGS chassis was also intended to serve as the platform for the hypervelocity line-of-sight antitank (LOSAT) missile system, and building the chassis for the LOSAT alone would be rather expensive. Cummings is the Armyâs program executive officer for ground combat systems. A program restructuring in FY94 to reduce program concurrence also decreased the number of LRIP systems and slipped first unit equipped (FUE) by about 2 years. M8 Buford Armored Gun System Land Warfare; Army Picks BAE, GD For MPF Light Tank Prototypes: Upstart SAIC Is Out . similar to that on the M1A2. Trumpeter 1/35 05591 Soviet JSU-152K Armored Self-Propelled Gun. Its main armament is a 105mm The Army sought replacement in the United Defense M8 Armored Gun System, but the program was canceled in 1997 by the Pentagon before it could enter production. The main goal of the project was to provide the U.S. Army with a vehicle with sufficient firepower and the ability to withstand artillery shrapnel impacts and infantry-operated anti-tank weapon fire. Assembly and painting is required. When the Army submitted its proposed fiscal 1997 budge, Defense Secretary William Perry instructed the service to plan for an additional cut of 20,000 troops to pay for weapons modernization. The AGS was never successfully developed. Critical pieces of equipment needed to realize the division concept were never available. These failures hamstrung the division's development. The M35 has a rate of fire of approximately 12 rounds per minute, with a ready capacity of 21 rounds with 9 more in stowage. The M8 project was eventually canceled. In the 1980s, the United States Army began looking for a replacement for their M551 Sheridan tanks. Price: $71.49 & FREE Shipping: This fits your . Plummer, A. It was the ultimate incarnation of several research programs run in the 1970s with the aim of providing air-mobile light infantry forces with the firepower needed to last in the battlefield. After a market survey indicated that nothing "off the shelf" would satisfy the ROC, the Army Systems Acquisition Review Council (ASARC) in May 1992 approved a program, beginning with EMD, to develop and produce the AGS. Fire control is provided by a digital fire control system with microprocessors and a databus The AGS is not a tank -- it may look like a tank, but it's not a tank. The forced retirement of the Sheridan and broken promise to replace it with the M8 Buford or Ridgway Armored Gun System (a Light AFV with 105mm or 120mm main gun shock action that can be air-delivered to support our Paratroops) due to alleged "budget cuts" is a serious mistake that fortunately can be easily fixed. The M8 is the result of the Armored Gun System (AGS) concept that originated in the early 1980s to It has more than one role, and it just doesn't kill tanks. One of the concepts that came up was the Armored Gun System (AGS). It has to be able to bust bunkers, shoot into bunkers, go into urban areas and shoot into windows, and have a round that will spray shrapnel -- that will "take out" people who are firing hand-held weapons or machine guns. In 1980 the Army's 9th Infantry Division was selected as the test unit for the new High Technology Light Division (HTLD). The HTLD was designed to fight in the deserts of Southwest Asia. Taiwan at one point expressed interest as a replacement for its fleet of M24 Chaffee/M41 Walker Bulldog light tanks but would not commit following cancellation by the US. FMC, now part of United Defense Limited Partnership (UDLP), was the winning contractor. fare better than forces equipped with current firepower. Unfortunately the whole Armored Gun System programme was canceled in 1996 and the M8 Buford did not entered service with the US Army, leaving airborne forces dangerously low on firepower. Level III armor cannot be carried by C-130. The M8 project was eventually canceled in 1997. Last one. Free shipping. $10.99 + shipping . A ROC document for the AGS was approved by the Army in 1985, but the AGS could not be sufficiently funded and was terminated in 1987. Secretary of the Army, Hon. The Army's Armored Gun System was terminated in 1996, and the FY 97 budget abandoned the Armored Gun System program. Images: 125 + Actions Info. In 1993 survivability test assessments were initiated the Armored Gun System. United Defense again pitted their AGS against other vehicles in the Mobile Gun System program of the 2000s. BAE Systemsâ design is an updated M8 Buford armored gun system with new capabilities and components. Make sure this fits by entering your model number. Although an organizational and operational plan was developed, further actions on the MPGS program were deferred in 1982. The total program cost, including development, was estimated to be $1.3 billion. The M8 is the result of the AGS concept which originated in the early 1980s as a means of providing light forces with more powerful direct support. The Army was only able to field prototypes of some key pieces of the high technology equipment. The Expeditionary Light Tank is an improved version of the M8 AGS (Armoured Gun System) designed and manufactured by the Company BAE Systems. It was intended to replace the M551 Sheridan in the 82nd Airborne Division and the TOW-equipped Humvees in the 2d Armored Cavalry Regiment. Plastic model kit of the M8 Armored Gun System, an American light tank that was intended to replace the M551 Sheridan in the 82nd Airborne Division, as well as being expected to replace TOW-equipped Humvees in the 2nd Armored Cavalry Regiment (2nd ACR). The M8 Armored Gun System was developed by United Defense Industries to meet the requirements of the US Army for an air deployable Armored Gun System to replace the M551 Sheridan.The first prototype was completed in 1985 and several more were built until cancelation of the project ⦠The HTLD was designed to fight in the deserts of Southwest Asia. The M8 is the result of the Armored Gun System (AGS) concept that originated in the early 1980s to provide light forces with more powerful direct support. The Level II armor package can still be carried by C-130, but must be airlanded and is designed for use by light forces in a more serious threat environment, while level III armor is designed for contingency operations and is supposed to provide protection against light handheld anti-tank weapons. The Army was only able to field prototypes of some key pieces of the high technology equipment. The armored gun system used titanium appliqu� armor. The M8 Armored Gun System is meant to provide a firepower boost to light infantry forces, particularly paratroopers. Major General Brian Cummings was recently given a detailed update on the SVA plans with the 82 nd Airborne Division. The design of the light tank stemmed from the US Army's "Armored Gun System" program enacted in 1992 and, of the submissions reviewed, a joint design by the concerns FMC and United Defense was chosen for evaluation (part of the BAe Systems Land and Armament family). The fiscal 1997 Defense budget request contained no further Army troop cuts, but the Army cut the AGS program in an attempt to save money for other modernization efforts. This technology demonstrator was a test bed to bring Future Combat System technologies to the current force in the near term. by Sdkfz.000 on Net Maquettes. M8 Armored Gun System is similar to these weapons: M551 Sheridan, T71 Light Tank, M60 Patton and more. the driver. United Defense has reportedly been seeking overseas customers, so far without success. News Feed. The M8 resembles a conventional tank, but M8 Armored Gun System. Termination liability was funded from research and development appropriations because the program was under an engineering and manufacturing development contract. "Thunderbolt" Armored Gun System (Block II). (15 March 2004). Inside the Army. The autoloader holds 21 projectiles with nine more stowed forward near The basic hull of the M8 is made of welded aluminum alloy, with a unique modular armoring system that allows the vehicle to be equipped according to requirements. $56.83. M8 Armored Gun System Tank 1/87 1/72 various scales 3D Printed. The M8 is armed with the M35 rifled autoloading 105 mm cannon main gun with an M240 7.62 mm machine-gun mounted co-axially. In the case of the AGS, it could not even field prototypes. The vehicle was designed to support the infantry from a position where it can fire and be behind dirt with an elevated gun and to fight in areas where its not going to run into tanks. The BAE Systems M8 Armored Gun System was an American light tank that was intended to replace the M551 Sheridan in the 82nd Airborne Division, as well as being expected to replace TOW-equipped Humvees in the 2nd Armored Cavalry Regiment (2nd ACR). In 1980 the Army's 9th Infantry Divisionwas selected as the test unit for ⦠$21.41. BAE Systems M8 Buford Armored Gun System (YouTube) The 82nd Airborn Division, at Fort Bragg, NC will soon be receiving prototypes of the new Mobile Protected Firepower (MPF) vehicle. The newsfeed doesn't contain any items. Rather than accept a cut from 495,000 to 475,000 troops, Army leaders argued they could obtain the necessary modernization funds through acquisition reforms and operating efficiencies. and the use of modular appliqu� bolt-on armor that is not used in a load-bearing application. Early live fire tests for this program either demonstrated that the initial AGS design meets its requirements or provided data to support design fixes. Its role in the 2nd ACR was eventually taken by the Stryker. It is not a coincidence that the Army canceled the program. One of the concepts that came up was the Armored Gun System (AGS). The United Defense M8 Armored Gun System was a light tank that was intended to replace the M551 Sheridan in the 82nd Airborne Division, as well as being expected to replace TOW-equipped HMMWVs in the 2d Stryker Cavalry Regiment (2nd ACR). provide light forces with more powerful direct support. M8 Armored Gun System (AGS) je bio naziv za ameriÄki lahki tenk koji je trebao biti zamjena za M551 Sheridan tenk kojeg je koristila 82. zraÄno-desantna divizija ameriÄke vojske. This demonstrated system upgrade retains the M8's C-130 Hercules air transport capability, as well as the AGS 3-man crew.